D1 motorway Bratislava - Trnava, interchange Triblavina

Facts and Figures
Company PORR s.r.o.
Principal Narodna dialnicna spolocnost a.s. (NDS – National Motorway Company)
Location Triblavina - Slovakia
Type Straßenbau
Runtime 04.2015 - 05.2021

Quality, discipline, efficiency.

The construction of interchange Triblavina is located on km 18 of highway D1 Bratislava – Trnava. The interchange is designed as grade-separated, diamond, and it will be connected onto existing highway D1 in the section from Bratislava to Senec by four connection branches.

A bridge will be built on the highway as part of the interchange construction, which resolves the grade-separated crossing of highway D1 with the new road passing under the highway. It is designed as a maintenance-free frame bridge. The bridge object has two spans, the theoretical width of both spans is 12.35m. The superstructure is a composite reinforced steel frame structure, the upper deck is 0.65m thick. Frame struts are in-situ and they are connected with the upper slab and the in-situ foundation slab.

Given the fact that it is essential to maintain the traffic on the operated highway during construction, it will be necessary to secure the slope of the operated highway using nails and sprayed concrete. The bridge foundations on piles are impacted by the groundwater level, where the foundation joints of lean concrete are approximately 2m below the stabilised groundwater level. And they are to be carried out under the protection of sheet pile walls.

The demanding construction schedule places very high requirements to the observation of the highest quality of works, technological discipline during works, but particularly on coordination of the entire interchange construction.